Leave a Message

By providing your contact information to Brett Dalzell, your personal information will be processed in accordance with Brett Dalzell's Privacy Policy. By checking the box(es) below, you consent to receive communications regarding your real estate inquiries and related marketing and promotional updates in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. You may opt out of receiving further communications from Brett Dalzell at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe.

Thank you for your message. We will be in touch with you shortly.

The Building That's Been City Hall Is About to Become a Hotel Again

The Building That's Been City Hall Is About to Become a Hotel Again

Drive past Center Avenue and 5th Street in downtown Moorhead and you'll see a seven-story building with City of Moorhead signage bolted to the front of what was, for more than two decades starting in 1950, the Frederick Martin Hotel. Most people who work in that building every day know it by its old nickname, the FM Building, and fewer of them know that within a matter of weeks it's scheduled to stop being a government office and start becoming a hotel again.

That reversal is the clearest single fact about downtown Moorhead this fall. Everything else happening in the loop district, from a coffee shop closing to a florist opening to two weeks of parades and sausage, is downstream of the same construction calendar that's about to send City Hall staff back across the street.

A Government Office Living Inside an Old Hotel

The Frederick Martin Hotel opened in September 1950, named for the young son of one of the businessmen behind the project. It ran as a hotel through multiple ownership changes until it hit foreclosure in 1973, and downtown Moorhead changed shape around it as the Moorhead Center Mall went up nearby. For decades afterward, the building operated as an office condominium, unremarkable except for the ballroom on its glass-walled seventh floor, a leftover from when it was called the Treetop Room and looked out over both cities.

When Moorhead's actual City Hall, the low, flat building locals call the sugar cube, needed a full renovation, the city didn't build temporary trailers. It moved into the FM Building, occupying the first, fifth and seventh floors while McGough Construction oversaw the roughly $20 million renovation project across the street. That arrangement was never meant to be permanent, and according to the city, staff are expected to move back into the renovated headquarters in November.

That handoff matters beyond city payroll. Developer Kevin Bartram has owned the FM Building's upper floors since 2023 and picked up the first floor and basement after U.S. Bank closed its downtown branch there. His plan, reported by InForum, is a 76-room boutique hotel with restaurants on the ground floor and that same seventh-floor space that used to be the Treetop Room. He's told reporters construction takes roughly a year and a half once it starts, which means the building's next life doesn't begin the day the city moves out. It begins whenever the actual work starts, and City Hall's departure in November is the event that clears the way for that to happen.

The Rest of the Loop District Is Moving on the Same Clock

The FM Building isn't an isolated project. Downtown Moorhead Inc. laid out the broader plan to the Clay County Board this month, and the pieces line up with the same construction season. The 650 Center Building's phases are complete and occupied. An underpass connecting parts of the loop district is targeted for an October ribbon cutting. A civic plaza is planned for spring programming once the ground thaws.

Matt Lysath, who presented the update, framed the private investment in blunt dollar terms, describing one downtown block alone as carrying "a minimum of $25,000,000 investment" once the FM Center hotel and restaurant conversion is counted alongside the surrounding redevelopment. He also pointed to library card sign-ups as a proxy for how much foot traffic the loop district is already pulling in, noting that roughly half of Moorhead residents now hold one.

That's a useful number to sit with. A library card isn't a real estate transaction or a construction permit. It's a habit, and a rising one, in a part of town that spent the better part of two years as a construction zone with a temporary city hall bolted into an old hotel.

What's Actually Changed on the Ground Floor

Storefront turnover downtown has been uneven, and it's worth being specific about which businesses moved rather than treating it as vague churn. Twenty Below Coffee Co. closed both of its locations in July, including the one at 600 Eighth Street South in Moorhead, ending a run as one of the area's more recognized independent coffee roasters. In the same month, a new business took over a different storefront entirely: Bouquet Bar, a build-your-own-bouquet florist, opened July 24 in the space formerly occupied by Country Greenery.

Those two events aren't directly connected, but together they describe a downtown where storefronts are actively turning over rather than sitting vacant, in the middle of a construction season that's also delivering a finished apartment building, an underpass, and a soon-to-be-vacated government tenant three blocks away.

Two Weeks That Showed the City Still Shows Up

None of the construction and redevelopment talk happened in a vacuum this fall. Moorhead spent the first two weeks of September on Greater Moorhead Days, a celebration that's run since 1950. Steve French, who runs community engagement for Moorhead Parks and Recreation, joked to a local reporter about the timing landing on Labor Day weekend this year:

"We didn't move the festival. It's Labor Day that moved."

The ten-day run included specifics that only make sense if you already live there: Moorhead Cruise Night in the M State west parking lot, a parade of roughly 80 units running north on 20th Street from 28th Avenue South to 14th Avenue South, the Inclusive Moorhead Welcome Week Global Market immediately after the parade, and a medallion hunt that hid 23 medallions across city parks instead of the usual handful. Free canoe and kayak rentals ran at Viking Ship Park, the same spot that turns into a river-recreation launch point every summer and a cold-weather playground once winter's Frostival takes over.

The city's fall calendar didn't stop there. Sausage Fest ran September 26 and 27 at First Presbyterian Church, closing out the same September that saw the Downtown Moorhead Inc. presentation, the ongoing City Hall renovation, and the countdown to the FM Building's next chapter.

What This Means for Anyone Watching That Corner

By the time the leaves are down, the sequence should be visible in real time. City Hall staff move back into their renovated building in November. The FM Building, once that happens, stops being a government office for the first time in roughly two years and sits available for the hotel conversion Bartram has been planning since 2023. The underpass ribbon cutting, if it lands on schedule in October, will have already reshaped how the loop district connects before that handoff even happens.

None of this is subtle if you know to look for it, but most of it moves slowly enough that it's easy to miss unless you're paying attention to which building has city vehicles parked outside it and which one doesn't.

If you've been watching that corner of downtown change shape and you're curious what any of it might mean for property nearby, Up North Real Estate is always glad to talk through what we're seeing on the ground.

Work With Us

You don't just need an agent to help you sell your home. You need an extremely skilled marketer, negotiator, and problem solver. We're here to help you command a premium for your home.

Follow Me on Instagram